Project manager's main responsibilities:
Year 2007
Stage I
Study regarding the methodology of establishing the requirements and constraints for decontamination, in view of nuclear installations decommissioning, as well as the radwastes management generated by decontamination and nuclear installations decommissioning
Year 2008
Stage II
Study regarding evaluation of materials, structures and equipment contamination, in case of nuclear plants of CANDU type. Contamination with tritium and radiocarbon
Year 2009
Stage III
Scientific and technical bases of decontamination methodologies, in case of nuclear installations decommissioning costs-benefits evaluations
Stage IV
Methodologies of radwastes management on categories from initiation to final storage
Year 2010
Stage V
Study regarding decontamination methodologies and radwastes management, in case of nuclear plants of CANDU type cost-benefits evaluations
Main responsibilities of partners:
Partner 1 in research has the following responsibilities on stages:
Year 2007
Stage I
Study regarding evolution of decontaminating and radwastes management since nuclear installations decommissioning
Year 2008
Stage II
Researches regarding surface and in depth contamination of materials, structures and equipment surfaces, in case of nuclear installations
Year 2009
Stage III
Decontamination methods applicable in case of surface contaminated both with tritium and radiocarbon
Stage IV
Methods of minimizing the radwastes quantities and their enlisting in a lower storage category
Year 2010
Stage V
Decontamination methods and techniques applicable to decommissioning of CANDU type. Management of radwastes generated further to decontamination and decommissioning activities of nuclear plants of CANDU type.
Partner 2 in research has the following responsibilities on stages:
Year 2007
Stage I
Comparative study regarding the decontaminating methods, applicable to nuclear installations decommissioning
Year 2008
Stage II
Theoretic bases of overtaking the surface contamination in direct contact with working fluids and of other contaminating routes. Modeling of contamination way of materials, structures and equipment
Year 2009
Stage III
Testing in laboratory regarding the efficiency of surface decontamination methods in case of both superfluous and in-depth decommissioning
Stage IV
Advanced methods of radwastes treatment, applicable to nuclear installations decommissioning for valuable materials recovery
Year 2010
Stage V
Optimization of decontamination flux and radwastes management on the identified categories
|