Responsibilities and activities of the Project Manager (CO)
Year 2012
Phase I:
Evaluating and selecting the optimal technologies of filling the gaps
between packages with radioactive waste conditioned to the Băiţa,
Bihor repository (DNDR)
Activity I.1: Analysis of filling technologies used in LLW and ILW
disposal rooms in repositories similar to DNDR and selecting the filling
technology applicable for DNDR Băiţa, Bihor.
Year 2013
Phase II:
The development of the plan for closure the DNDR Băiţa, Bihor in
nuclear safety conditions
Activity II.1: Determination of the optimum technology to close DNDR
based on obtained experimental data.
Year 2014
Phase III: Complete Closure Plan of
DNDR Băiţa, Bihor in terms of nuclear safety
Activity III.1: Develop Conceptual Closure technology of DNDR based on
all experimental data obtained.
Year
2015
Phase IV: Proposing a closing system of DNDR Băiţa Bihor on experimental
work carried out
Activity IV.1: Improving the closing variant of DNDR-BB on experimental
work carried out.
Year
2016
Phase V: Performance evaluation of engineered barriers including closing
system proposed at DNDR
Activity V.1: Sustainability assessment of engineered barriers including
closing proposed in optimum variant.
Responsibilities and activities - Partner 1
(P1)
Year 2012
Phase I
Activity I.2: Laboratory experiments on the behaviour of filling
material in saturated medium. Variant proposals for filling the gaps.
Year 2013
Phase II
Activity II.2: Evaluation of closure technologies used in other
countries for similar installations. Feasible variants in DNDR case.
Year 2014
Phase III
Activity III.2: Development the final version of Conceptual Closure
technology of DNDR.
Year
2015
Phase IV
Activity IV.2: Laboratory experiments with representative key
radionuclides Co-60 and Cs-137.
Year
2016
Phase V
Activity V.2: Characterization of engineered barriers including closing
system components in terms of delay radionuclides migration.
Responsibilities and activities - Partner 2
(P2)
Year 2012
Phase I
Activity I.3: Analysis of the behaviour in time of the disposal system
of packages with radioactive waste in accordance with changes in the
technology for filling the gaps.
Year 2013
Phase II
Activity II.3: Analysis of DNDR closure systems evolution in terminal
conditions. Risk assessment scenarios.
Year 2014
Phase III
Activity III.3:
The analysis of closures of DNDR the boundary conditions. Final Risk
Assessment Scenarios.
Year 2015
Phase IV
Activity IV.3:
The study of progress of engineering barriers based on experimental data
carried out.
|