Responsibilities and activities

Responsibilities and activities of the Project Manager (CO)

Year 2012

Phase I:  Evaluating and selecting the optimal technologies of filling the gaps between packages with radioactive waste conditioned to the Băiţa, Bihor repository (DNDR)

Activity I.1: Analysis of filling technologies used in LLW and ILW disposal rooms in repositories similar to DNDR and selecting the filling technology applicable for DNDR Băiţa, Bihor.

Year 2013

Phase II:  The development of the plan for closure the DNDR Băiţa, Bihor in nuclear safety conditions

Activity II.1: Determination of the optimum technology to close DNDR based on obtained experimental data.

Year 2014

Phase III: Complete Closure Plan of DNDR Băiţa, Bihor in terms of nuclear safety

Activity III.1: Develop Conceptual Closure technology of DNDR based on all experimental data obtained.

Year 2015

Phase IV: Proposing a closing system of DNDR Băiţa Bihor on experimental work carried out

Activity IV.1: Improving the closing variant of DNDR-BB on experimental work carried out.

Year 2016

Phase V: Performance evaluation of engineered barriers including closing system proposed at DNDR

Activity V.1: Sustainability assessment of engineered barriers including closing proposed in optimum variant.

Responsibilities and activities - Partner 1 (P1)

Year 2012

Phase I

Activity I.2: Laboratory experiments on the behaviour of filling material in saturated medium. Variant proposals for filling the gaps.

Year 2013

Phase II

Activity II.2: Evaluation of closure technologies used in other countries for similar installations. Feasible variants in DNDR case.

Year 2014

Phase III

Activity III.2: Development the final version of Conceptual Closure technology of DNDR.

Year 2015

Phase IV

Activity IV.2: Laboratory experiments with representative key radionuclides Co-60 and Cs-137.

Year 2016

Phase V

Activity V.2: Characterization of engineered barriers including closing system components in terms of delay radionuclides migration.

Responsibilities and activities - Partner 2 (P2)

Year 2012

Phase I

Activity I.3: Analysis of the behaviour in time of the disposal system of packages with radioactive waste in accordance with changes in the technology for filling the gaps.

Year 2013

Phase II

Activity II.3: Analysis of DNDR closure systems evolution in terminal conditions. Risk assessment scenarios.

Year 2014

Phase III

Activity III.3: The analysis of closures of DNDR the boundary conditions. Final Risk Assessment Scenarios.

Year 2015

Phase IV

Activity IV.3: The study of progress of engineering barriers based on experimental data carried out.